Salvage economics
How traders price labour when flipping salvage
Published 2026-11-09 Β· Last updated 2026-11-09
Parts are easy: they have invoices. Labour is where salvage margins quietly disappear, because the hours are estimated loosely, the ownerβs time is treated as free, and paint is remembered as a number rather than a process.
This article sets out how to price labour honestly β into the project and into the bid β so the profit you calculate is the profit you keep.
Start with a labour rate you would charge a stranger
The first mistake is using an arbitrary low rate because the work is being done in-house. If your workshop could earn Β£45 an hour on retail work, then every hour spent on your own project costs Β£45 of foregone revenue, whether or not money changes hands.
Use the rate you would charge a customer for the same job. If you do not have one, use the local rate for the type of work β body, mechanical, electrical β and accept that regional rates vary widely. Then apply it consistently to every project so your margin figures are comparable.
Region and vehicle
Labour rates differ by region and by marque. A specialist bodyshop rate is not the same as a general workshop rate, and high-voltage or aluminium work costs more than steel panel work.
Estimate hours by task, not by feeling
Break the repair into tasks and give each a number. The point is not perfect accuracy β it is that a task list can be reviewed, argued with and improved, while a single guessed total cannot.
| Task | Typical hours (varies by car) |
|---|---|
| Strip and assess | 3β8 |
| Panel replacement (per panel) | 4β10 |
| Paint and blend (per panel set) | 6β16 |
| Airbag set including dash and trim | 6β14 |
| Structural pull and measure | 8β24 |
| Mechanical / cooling pack | 3β10 |
| Reassembly, valet, road test | 4β8 |
Indicative only
These ranges show the shape of a project. Real hours depend on the vehicle, the damage and whether parts fit first time β and they frequently do not.
Paint is not a line item, it is a process
Buyers consistently underprice paint. Materials alone β primer, base, clear, blending, consumables β cost money before anyone picks up a gun, and the labour to prepare, mask, blend and polish is substantial.
If you are paying a bodyshop, get the paint quoted separately from the panel work so you can see what it actually costs. If you are doing it yourself, price the materials and the hours at the same rate as everything else, or your margin calculation is fiction.
Sublet work and specialist labour
- Airbag coding and diagnostics β often needs manufacturer-level software.
- Alignment and geometry after structural or suspension work.
- Air conditioning recharge after a front-end repair.
- High-voltage battery work on EVs and hybrids β specialist, and priced accordingly.
- Keys, immobilisers and security modules, which are frequently overlooked.
- Recovery and transport to and from specialists, plus the days the car sits waiting.
Your own time is a cost, not a bonus
A project that takes sixty hours and returns Β£1,500 has paid you Β£25 an hour before you account for the risk, the capital tied up and the storage. That may still be worth doing β but you should know the number rather than discovering it at the end.
The practical test: if you had spent those hours on paid retail work, would you be better off? If the answer is consistently no, the project is a hobby with a profit-shaped story attached.
Build labour into the maximum bid
RepairIQβs estimate includes a labour rate input. Set it to the rate you would genuinely charge, not the lowest number you can justify. The maximum bid falls as the rate rises, which is the correct behaviour: a project that only works with cheap labour is a project with no margin.
Then hold that ceiling at the auction. Labour overruns are the norm, not the exception, and the bid is the only cost you can still control once you have won the car.
What traders get wrong
- Valuing their own hours at zero.
- Forgetting paint materials and masking time.
- Omitting coding, alignment, A/C and keys from the plan.
- Quoting the best-case hours and budgeting them as if guaranteed.
- Comparing projects by repair cost instead of by profit per hour.
- Letting the labour rate drift down to make a marginal lot look viable.
Frequently asked questions
What labour rate should I use in a salvage calculation?
Use the rate you would charge a customer for the same work, or the local rate for that trade. It varies by region and by marque, and specialist or high-voltage work costs more than general panel work.
Should I include my own labour in the repair cost?
Yes. If your time has a market value, it is a cost even when no money changes hands. Excluding it hides a low return that you would notice immediately on paid work.
How much does paint add to a repair?
It varies enormously with the number of panels, the colour and the standard of finish. Materials alone are significant, and the labour to prepare, blend and polish is substantial. Get it quoted separately where you can.
How do I compare two salvage projects fairly?
Compare profit per hour of work, not headline profit. A larger profit on a project that takes three times as long may be the worse use of your workshop.
Why does a higher labour rate lower my maximum bid?
Because the bid is what remains after repair cost, fees and profit are subtracted from resale value. Higher labour means higher repair cost, which means less room to bid.
Related reading
Know your numbers before you bid
Free salvage repair cost calculator β UK and USA. No sign-up required.
RepairIQ is an independent estimation tool. It is not affiliated with Copart, IAAI, BCA or any vehicle manufacturer. Cost ranges are indicative and vary by region, vehicle and workshop.